I should have added to the previous post, the reason the house was stuccoed the way it was. We avoided stuccoing the lower portion of the house because 1) they would have had to stucco below the deck and chop down plants out of the way, and we weren't down with the preparation involved, and 2) it is our intent, to put stone around the base of the house all around.
Anyway, here is the inside to date.
Mike is working on installing electrical finish today, so we can begin flooring tomorrow.
Both the Js picked their own color and I picked Brodys.
And yes, these pictures are the worst, but again, I can't get a good view of the rooms from the inside.
Here is Jesse's room.
Hallway #1
Hallway #2, which has a heinous green tinge to the walls only because the plywood convering up the connection between the inside the rest of the house to the addition is painted a dark olive green.
Brody's room
Janee's room
We are still planning on a move in date on next Friday, and if Mike can finish the electrical today, we are 1 day ahead of schedule. Now, if only Janee didnt surprise us with having 3 soccer games on move in weekend, we might be able to actually get some moving done....................
No comments:
Post a Comment