Monday, October 12, 2009

31 Weeks, 1 Day

Only in our house does decorating a room for X include ripping down drywall....

I can't update with pictures yet because Mike is in there with a crowbar and a sawzall right now going at it.

We plan to:

Add new drywall around room, tape and mud, trim

Wood Ceiling

New lighting

New wood Laminate flooring

Paint

My biggest problem in the room is lighting, or lack of....so rather than staining the wood ceiling like we have elsewhere, I have to paint it a shade of offwhite.

And the walls have to be painted super light......I am thinking yellow...being I hate pink, purple, and all things girl like.....

Besides, the kick ass crib sheets I found are yellow with brown and green funky polka dots, so there it is.

My ailments:

Insomnia
Horrible Back pain
Heinous headaches ( I think related to back pain?)
Naseau
And head trips over having to have an operation
Restless legs
Being constantly out of breath after moving for 2 seconds
And my "favorite"? Peeing 3 drops every 10 minutes or so. I think I go to the bathroom 400 times a day

Regardless, things are moving along scarily.

The room is under construction, the C-section is scheduled......

No comments: